Beacon House - Transitional Housing (People In Progress)

Beacon House - Transitional Housing (People In Progress)

This building was over 100 years old, did not have a foundation system, and was not accessible due to its raised first floor and split level design. It was originally a hotel. This project included a full structural and accessibility upgrade. The hotel was converted to a transitional housing project using a change of use status. By turning the rear yard split level floor into the main entry and opening up the center of the building with a new stair tower and elevator all floors became fully accessible. Keeping the aesthetic design of 100 years ago gave the project its historic feel. Natural light was brought into the basement and the area was converted into multi use community spaces. All guest rooms were paired with shared toilet rooms and laundries on each floor. What was the main entry became the offices and sitting rooms for the guests. All fire and life safety issues were brought up to current code.

Legal

The content of this website is provided for information purposes only. While every effort is made to ensure that the information contained within the website is accurate and up to date, JHAI makes no warranty, representation or undertaking whether expressed or implied, nor does it assume any legal liability, whether direct or indirect, or responsibility for the accuracy, completeness, or usefulness of any information.

All materials, unless otherwise stated, are copyright and remain the property of JHAI.